Frequently Asked Questions
If you’re planning an ADU in Enterprise, NV, the questions below are the ones homeowners ask us most. We’ve answered each one directly, with real numbers and plain-English explanations, so you can move from “maybe” to a written plan faster. If your exact question isn’t here, one call answers it.

Pricing & Estimates
How much does an ADU cost in Enterprise, NV?
Most ADU projects in Enterprise run between roughly $120,000 and $350,000 depending on type, size, and finish level. A garage conversion or interior conversion typically lands in the lower band, a new detached ADU sits in the middle to upper band, and a larger custom build with premium cladding pushes toward the top. Prefab models from brands like Abodu, Cover, or Boxabl can bring the number down because factory construction trims site labor. We put your exact price in writing before any work starts, so the ballpark becomes a firm number you can plan around.
| ADU type | Typical Enterprise price range | What drives the number |
|---|---|---|
| Junior ADU (JADU) / interior conversion | $65,000 – $130,000 | Existing walls, egress, kitchenette and bath tie-ins |
| Garage conversion ADU | $95,000 – $180,000 | Slab, insulation, new systems, door infill |
| New detached ADU (prefab panel) | $150,000 – $280,000 | Foundation, utility trenching, brand and model |
| New detached ADU (site-built) | $180,000 – $350,000 | Custom layout, cladding, roof complexity |
| Site prep, utility trench, and permits | $8,000 – $35,000 | Distance to main, grading, jurisdiction fees |
Do you offer free estimates?
Yes, every estimate is free and comes with a written price before any work starts. We don’t do verbal ballparks that shift once the crew is on site. You’ll see line items for site prep, foundation, framing, utilities, finishes, and permit fees, so you can compare bids apples to apples. Call (844) 980-0541 to schedule yours.
How is an ADU priced if I choose a prefab brand?
A prefab ADU is priced in two parts: the factory package and the site work. Brands like Abodu, Dvele, Mighty Buildings, Plant Prefab, and Tuff Shed supply the structure, and we quote the foundation, utility connections, delivery, and finishing as a separate written scope. That split keeps the pricing honest and lets you see exactly what the factory covers versus what happens on your lot in Enterprise. Some homeowners pick a prefab to shorten the build calendar; others go site-built for a custom footprint. Both get the same written price before a shovel turns.
Is it cheaper to convert my garage or build new?
A garage conversion is almost always less expensive than a new detached build because the shell, slab, and roof already exist. In Enterprise, converting a standard two-car garage often saves $40,000 to $90,000 compared with building a detached ADU of similar square footage. The catch is layout: plumbing runs, ceiling height, and egress all shape the final number. We’ll walk your garage and tell you which path gives you more usable space per dollar before you commit.
What payment methods do you accept?
We accept standard payment methods including major credit cards, debit cards, and bank transfers, with a digital invoice you can pay by link. Larger projects are typically billed in stages tied to completed milestones, so you’re never paying for work that hasn’t happened. Your written agreement spells out the schedule up front. Call for specifics on your project’s payment plan.
Service & Scheduling
Do you offer emergency ADU service?
ADU construction isn’t an emergency-service category the way a burst pipe is, but we do answer the phone around the clock, every day of the year. If something goes wrong mid-build or after handover, a live person picks up and routes it to the right crew. For active jobs we prioritize site issues that affect weather-tightness or safety. Call (844) 980-0541 any time and you’ll get a human, not a voicemail loop.
How fast can you respond?
For new project inquiries, we typically schedule a site visit within a few business days and follow with a written proposal. For active projects with a reported issue, we aim to have someone on site quickly, and our 365-Day Done Right Promise means if a covered item fails within a year, we come back and fix it. We also include a free second visit if any covered repair fails. Exact timing depends on crew availability in Enterprise and the nature of the call.
Can you build an ADU while I live on the property?
Yes, most of our Enterprise clients stay in their home during an ADU build. We stage materials to keep your driveway and daily routine as clear as possible, and crews arrive in uniform after a background check, so you always know who’s on your property. For a new detached unit, the disruption is mostly yard access and utility trenching. For an interior or garage conversion, we plan dust barriers and work hours around your schedule.
How long does an ADU build take?
A prefab ADU can go from foundation to finish in a shorter window than site-built, often because the structure is manufactured off-site and assembled on your lot. Site-built detached units generally take longer because every phase happens on-site. Garage and interior conversions fall somewhere in between. We give you a written schedule with your price so you know what to expect week to week. For a closer look at our approach, see our ADU Builders in Enterprise page.

Licensing & Trust
Are you licensed and insured?
Yes, we’re state-licensed and carry insurance, and we can provide documentation on request. Every project is also covered by The Relay Visibility Guarantee: a written price before work starts, a 365-Day Done Right Promise, a written guarantee on every project, and a free second visit if any covered repair fails. Our technicians are background-checked and arrive in uniform, so you’re never guessing who’s at the door.
Do you guarantee your work?
Yes, every project carries the 365-Day Done Right Promise in writing. If something we built isn’t right within a full year, we make it right, and we include a free second visit if any covered repair fails. The guarantee is stamped on your project documents, not buried in fine print. That’s a key piece of The Relay Visibility Guarantee that governs every job we take on in Enterprise.
Who actually does the work on my ADU?
Our technicians, who arrive background-checked and in uniform, perform the work, and our technicians have up to 20 years of experience. Prefab structures are manufactured by the brand you choose (Abodu, Dvele, Mighty Buildings, Boxabl, Plant Prefab, or Tuff Shed), while site work, finishing, and coordination are handled by our crews. You’ll know the plan, the price, and the schedule before anything starts.
Can I track my project’s progress?
Yes, real-time tracking is part of The Relay Visibility Guarantee. You get a confirmed price, a live arrival window, and photo proof as the work moves forward, plus a digital invoice payable by link. It’s the same transparency you’d expect from a rideshare app, applied to a construction project. No phone tag required.
Specific ADU Services
Do you handle ADU design and permitting?
Yes, we handle the design and permitting steps as part of your ADU project. Our team coordinates the layout, engineering, and submission to the jurisdiction so you’re not chasing paperwork between designers and the city. Exact permit timelines vary by jurisdiction, so we won’t promise a date we can’t stand behind, but we do keep you updated at every stage. For design decisions, we help you choose between a prefab model and a site-built plan based on your lot and budget.
Do you handle garage conversion ADUs?
Yes, garage conversions are one of our most requested ADU projects in Enterprise. Converting an attached garage typically involves upgrading insulation and systems, adding a proper egress path, and finishing the interior to a livable standard. It’s often the fastest and most affordable route to a rentable unit or an in-law suite. We’ll assess your garage’s slab, ceiling height, and utility access and give you a written price.
Do you handle new detached ADUs?
Yes, we build new detached ADUs, including prefab panel builds from brands like Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, and Tuff Shed, plus site-built units with James Hardie cladding. A detached ADU gives you the most privacy and the highest rental upside, but it also requires its own foundation, utilities, and setbacks. We’ll map out what fits your lot and put the number in writing before work starts.
Do you handle junior ADUs and interior conversions?
Yes, we build junior ADUs (JADUs) and interior conversions. A JADU is a smaller unit created inside or attached to an existing home, usually with a kitchenette and its own entrance, and it tends to be the most space-efficient and budget-friendly option. Interior conversions turn existing rooms or unused areas into a self-contained unit. Both come with the same written price and 365-Day Done Right Promise as any full build.
Do you offer free estimates?
Yes, free estimates are standard, and every estimate ends in a written price before any work starts. Call (844) 980-0541 and we’ll schedule a visit, review your goals, and hand you a number you can plan around. For the full picture of what we build, start at our home. For a closer look at our approach, see our ADU Builders in Enterprise page.
Step-by-Step: How an ADU Project Moves From Question to Finished Unit
Here’s exactly how a typical Enterprise ADU project runs, so you know what to expect before you call.
- Call and share your goal. Tell us whether you’re adding a unit for family, rental income, or a workspace, and we’ll set a site visit.
- Site visit and written proposal. We walk your property, check setbacks and utility access, and deliver a written price before any work starts.
- Design and permitting. We choose the layout (site-built, garage conversion, or a prefab brand like Dvele or Mighty Buildings) and manage permit submission.
- Site prep and foundation. Crews handle grading, foundation, and utility trenching, with photo proof and a live arrival window.
- Build and finish. Prefab panels are assembled or site-built framing goes up, then finishes and utilities are completed.
- Walkthrough and guarantee. We hand over the finished unit, your digital invoice, and the 365-Day Done Right Promise in writing.
What areas do you serve?
We serve Enterprise, NV and surrounding neighborhoods, and each Benson ADU Builders location is independently owned and operated. Because we work in the local market, we understand the lot sizes, soil conditions, and permit office quirks that shape an ADU project here. If you’re just outside Enterprise, call and we’ll confirm coverage. Call (844) 980-0541 for a free estimate.
Key Takeaways
- ADU projects in Enterprise usually range from about $65,000 (JADU) to $350,000 (custom detached).
- Every project comes with a written price before work starts and the 365-Day Done Right Promise.
- We build with Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie.
- Free estimates, a live person on the phone 24/7, and background-checked, uniformed technicians.
- Garage, JADU, interior conversion, and new detached ADU projects all fall under the same guarantee.
Ready to get a real number?
Call (844) 980-0541 for your free estimate. We’ll schedule a visit, walk your lot, and hand you a written price before any work starts, backed by the 365-Day Done Right Promise and real-time project tracking. If you’d rather start with the basics, read our home page or the full ADU Builders in Enterprise breakdown. Either way, a live person answers, day or night.
Written by the team at Benson ADU Builders Enterprise.
Have a question we didn’t cover? Call Benson ADU Builders Enterprise at (844) 980-0541.


