A Benson company - serving Enterprise, NV
A new backyard ADU at golden hour seen from the main house patio
Benson · Enterprise, NV

ADU in Enterprise - Plans, Permits & Build, One Fixed Price

Backyard ADUs, garage conversions and additions for homes in Enterprise and the towns around it. A free site visit and one written price.

Work is performed by our local vetted partner.

5.0/5 rating · A local team serving Enterprise and nearby

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise

Start where you are

Just looking

Browse finished ADUs and conversions and see what each kind of build involves.

Browse builds

Making a plan

See how an ADU is designed, permitted and priced, and the promise behind the work.

How we work

Ready for a price

Book a free site visit and get a written, line-item price.

Book a site visit

Our most-requested builds in Enterprise

An ADU for every lot

Pick a build or a step to see what it covers, how it starts and one thing worth knowing before you begin.

Ways to add a unit More room for the main house Before the build
A new two-story ADU over a garage

Detached ADUs

What it covers: A new home of its own in the backyard: foundation, framing, utilities, kitchen, bath and finishes, built to the plans the city approved.

How it starts: With a look at the lot: setbacks, access for equipment and where the utility lines can run.

Good to know: Where the sewer line can reach often decides where the ADU goes, so it is checked before the design.

A single-story rear room addition with tall windows and a new patio

Room additions

What it covers: New square footage on the main house: footings, framing, the roof tie-in, windows and finishes matched to the house.

How it starts: With drawings and the permit. Nothing is dug until the plans are approved.

Good to know: Matching the roofline and siding is what makes an addition look like it was always there.

ADU plans, samples and a small model on a desk

Design & permits

What it covers: A site survey, floor plans, structural and energy calculations, and the permit set the city reviews.

How it starts: With what the household needs: a rental, a home for a parent, an office or a studio.

Good to know: Plan review can take more than one round; drawings that answer the city checklist up front save weeks.

A utility trench with new sewer pipe and conduit

Site prep & utilities

What it covers: Clearing, grading, trenching and new water, sewer and electrical lines run out to the new unit.

How it starts: By locating every existing line in the yard before the first trench is dug.

Good to know: An ADU often needs a larger electrical panel, so it is priced in from the start.

Getting started with Benson in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Benson job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Small homes that live large

Vaulted ceilings, compact kitchens, private decks and smart storage: the details that make a small home feel bigger.

Read our ADU guides
The living room inside a new ADUA compact kitchen inside a new ADUA small deck outside a new ADUThe bathroom inside a new ADUA new sunroom addition with three walls of windowsThe bedroom inside a new ADU

What Our Customers Say

Homeowners around Enterprise, in their own words.

★★★★★

"Plumbing and electrical passed on the first inspection."

Alan B.
Alan B. October 2025
★★★★★

"Clean, quiet crew. They respected the neighbors, kept noise to working hours, and swept the driveway every evening."

Hope C.
Hope C. June 2025
★★★★★

"Photos of each milestone, which I loved. Slab, framing, roof dry-in, each one came with a few pictures by text."

Gwen D.
Gwen D. February 2026

Frequently Asked Questions

Straight answers about how we work.

Guides and straight answers

Planning help from people who do this work every day.

Local Service Coverage
Part of Benson

We Are the Enterprise Team for Benson.

Benson ADU Builders is the adu company of the Relay Home Co. family. Your extra space, planned and priced in writing. Every job gets a written price before any work starts and is covered by The Relay Visibility Guarantee. Each location is independently owned and operated.

Same training, same parts, same pricing practice, and the same Done Right Promise - delivered by people who live here.

Visit Benson →
The family

Part of the Relay Home Co. Family.

Relay Home Co. is a family of home-service brands held to one written standard, and Benson is the ADU company in it. One promise stands behind every trade, in every town.

Discover Relay Home Co. →

Request a Free Estimate in Enterprise

Tell us what you need - Benson ADU Builders Enterprise responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch