ADU Specials in Enterprise, NV
Call (844) 980-0541 to ask which current offers apply to your project. We run a small set of standing offers in Enterprise because the first conversation about an ADU should cost you nothing. Every one of them is written down before work starts, so the discount you were promised is the discount you see on the invoice. No verbal estimates that shift, no surprises at the door.
Current Offers

Free Written Estimate on Any ADU or Addition
We put your project scope and price in writing before any work begins, at no cost and with no obligation. It covers a full ADU, a home addition, or a single room addition anywhere in Enterprise, and it’s the same document that governs the job later, not a rough number scribbled on a card.
Valid through March 31, 2027. Mention this offer when you call (844) 980-0541.
Free Second Visit Under the 365-Day Done Right Promise
If a covered repair on a completed project fails within a full year, we come back at no charge. This applies to every project we finish in Enterprise, and the promise is stamped in writing on the project paperwork so you’re not relying on anyone’s memory.
Valid through March 31, 2027. Mention this offer when you call (844) 980-0541.
Prefab Brand Walkthrough at No Cost
We build with Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, and Tuff Shed, plus James Hardie cladding. Enterprise homeowners can sit down with us and compare how each prefab panel system fits a lot, a budget, and a timeline, and you’ll leave knowing which names to research on your own.
Valid through March 31, 2027. Mention this offer when you call (844) 980-0541.
Fixed Written Pricing, No Change Orders After the Fact
Your scope is priced line by line before work starts, and nothing gets billed after the fact for work that was already in the plan. Available on ADU and addition projects across Enterprise, and the final invoice is a digital one you can pay by link.
Valid through March 31, 2027. Mention this offer when you call (844) 980-0541.
Courtesy Pricing for Seniors and Military Households
We keep a standing courtesy for seniors and military families building in Enterprise, applied to the written estimate so you see it before you commit. Ask about it on the call and we’ll tell you exactly what it covers and what it doesn’t.
Valid through March 31, 2027. Mention this offer when you call (844) 980-0541.
Free Permit and Setback Review
Setback rules (the minimum distance a structure must sit from your property line) and ADU versus JADU limits vary from lot to lot. We’ll review your parcel, flag what needs checking with the jurisdiction, and put the findings in your written scope at no cost.
Valid through March 31, 2027. Mention this offer when you call (844) 980-0541.
How to Redeem
Call (844) 980-0541 and tell us which offer you want. We’ll book the free estimate visit at a time that works for you, and a background-checked technician arrives in uniform with a live arrival window. Present the offer at the visit, or just name it on the call and we’ll note it on your written price before anything is signed. Simple as that.
Questions Enterprise Homeowners Ask About Our Offers

Does the offer still apply if my project changes after the estimate?
If the scope changes, we re-price in writing before that work starts, and the offer carries over to the revised document. You’ll never get a discount confirmed verbally and then see it disappear from the final invoice.
Can I stack more than one offer on the same project?
Some combine and some don’t, and we’ll tell you which on the call rather than let you find out later. The free written estimate and the free setback review generally go together. Call (844) 980-0541 and we’ll walk through it.
What does the 365-Day Done Right Promise actually cover?
It covers workmanship on the project we completed for 365 days, with a free second visit if a covered repair fails inside that window. The written guarantee is stamped on every project, so the terms live in your paperwork, not in a conversation.
Do you serve areas outside Enterprise, NV?
Enterprise is home base for these offers, and we can talk through nearby addresses when you call. Each Benson ADU Builders location is independently owned and operated, so the offers above apply to work booked through this Enterprise location.
Is there a charge to compare prefab brands?
No. The brand walkthrough is free, and there’s no pressure to pick one on the spot. Plenty of Enterprise homeowners take the comparison home, research Abodu or Boxabl on their own, and call us back when they’re ready to price.
Written by the team at Benson ADU Builders.


