A Benson company - serving Enterprise, NV
A new modern detached ADU in a backyard

Before & After Gallery - Benson ADU Builders Enterprise

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise

ADU Before & After in Enterprise, NV

Photos tell you more about an ADU builder than any sales pitch. Below you’ll find before-and-after write-ups of the kinds of ADU, home addition, and room addition projects we build in and around Enterprise, NV: the problem each homeowner faced, what got built, and the result. Every project started with a written price. When photos of finished Enterprise jobs are ready, they drop straight into the frames below, captioned by service.

Call (844) 980-0541

Recent Transformations

Detached ADU on a Tight Side Yard

Two builders installing wooden wall frame for accessory dwelling unit project
Before: underused side yard with an aging detached garage and failing slab.
construction workers installing steel frame for accessory dwelling unit
After: a detached ADU with James Hardie cladding, its own entrance, and a small patio.

The problem: an Enterprise homeowner had a 400-square-foot side lot sitting empty except for an old garage, and wanted rental space without losing the main backyard. We set a detached ADU well inside the setback line (the required distance between a structure and the property line) and used prefab panels from Plant Prefab to shorten the build. The result is a finished one-bedroom unit with separate access, its own meter, and a paved path linking it to the house. The homeowner gained a rentable space and kept the yard they use every weekend.

Backyard ADU Built From a Boxabl Panel System

professional adu builders service
Photo coming soon: before – bare backyard lot in Enterprise, fenced and ready.
Contractor applying sealant to the seam of a new home addition
Photo coming soon: after – a finished panel-built ADU with a covered entry.

The problem: a family in Enterprise needed a place for an aging parent to live independently, on the same property but not under the same roof. We worked from a Boxabl panel system, a prefab approach where the unit arrives in pre-built sections that get assembled on site, which cut the time the family spent living with construction noise. Landscaping, a covered entry, and a gentle step-free walkway went in around the assembled unit. The family ended up with a private, accessible home for a parent while keeping everyone close.

Attached Garage Conversion to a Junior ADU

Contractors performing professional home addition framing and construction
Photo coming soon: before – attached garage in Enterprise, before conversion.
Two construction workers framing a residential home addition project
Photo coming soon: after – the garage as a junior ADU (JADU) with kitchenette and separate door.

The problem: a homeowner wanted extra rental income but didn’t want to build a new structure in the yard. We converted part of the attached garage into a junior ADU, or JADU, a smaller unit that shares some systems with the main house and often counts toward a separate limit under local rules. The build added a kitchenette, a full bath, and a separate entry, and we added a new parking pad where the second garage bay used to sit. The result is an income unit tucked under the same roof, with no new building in the yard.

Detached ADU From a Cover Kit

professional room addition contractor service
Photo coming soon: before – narrow, sloped backyard in Enterprise.
Contractor installing plywood wall panels on a new room addition project
Photo coming soon: after – a finished kit ADU with a graded patio and new fence.

The problem: a sloped, narrow backyard made this Enterprise homeowner doubt an ADU was even possible. We used a Cover kit, a prefab package designed to fit compact urban lots, and graded the patio so the unit sat level against the slope. The finished ADU fits neatly along the fence line and now reads as an extension of the backyard rather than a cramped add-on. Grading and drainage were part of the price we quoted up front, so nothing changed once the ground was opened.

Prefab ADU From an Abodu Unit

Contractor installing OSB sheathing on a new room addition build
Photo coming soon: before – plain gravel side area in Enterprise, ready for a prefab unit.

The problem: a homeowner wanted a second unit built faster than a fully site-built ADU (one assembled stick by stick on the property) would allow. We placed an Abodu prefab unit and handled the prep work on site: leveling, utility runs, and the deck and steps around the entry. The result is a one-bedroom ADU with a full kitchen and bath that went in with far less mess and noise than a conventional build. Prefab doesn’t mean cutting corners on the finish, and the clean edges here show it.

Home Addition That Doubled a Back Bedroom and Added a Bath

The problem: a growing family in Enterprise had a bedroom too small to use well and only one bathroom for the whole household. We built a room addition (a single-room extension tied into the existing house) that roughly doubled the bedroom and added a full bath off it, matched the existing roof and exterior, and tied the new slab into the original foundation. The result is a primary suite that looks like it was always part of the house, with a bathroom line that no longer backs up on school mornings. The written price we gave before opening a wall held from start to finish.

Want Results Like These?

If one of these Enterprise ADU projects sounds like your situation, the first step is a free estimate. You’ll get a written price before any work starts, a documented scope, and real numbers on the ballpark your project should run. Call Benson ADU Builders Enterprise at (844) 980-0541 and let’s talk through what your property can hold. Background-checked, uniformed technicians on every job site. Licensing and insurance details are confirmed in writing with your estimate.

Written by the team at Benson ADU Builders Enterprise.

Getting started with Benson in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Benson job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need ADU help in Enterprise? Licensed & insured · free written estimates
Call (844) 980-0541
Local Service Coverage

Request a Free Estimate in Enterprise

Tell us what you need - Benson ADU Builders Enterprise responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch