A Benson company - serving Enterprise, NV
A quiet residential street with a new ADU behind one of the homes
North Las Vegas, NV

ADU Services in North Las Vegas - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The living room inside a new ADU
A second-story addition that matches the existing roofline
A second-story addition with a balcony, matched to the original house
A single-story rear room addition with tall windows and a new patio
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Services in North Las Vegas, NV

An ADU in North Las Vegas is a second, fully legal home on your lot, and on most single-family parcels here that’s allowed by right. Whether you’re eyeing a casita for aging parents, a rental unit, or a quiet office away from the house, we build them with a written price before a shovel turns. Our technicians have up to 20 years of experience, and we know the North Las Vegas lot lines, block walls, and HOA review boards that shape what actually gets built. Call (844) 980-0541 and a live person picks up.

Call (844) 980-0541

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 980-0541

Why North Las Vegas Homeowners Choose Benson ADU Builders Enterprise

A new two-story ADU over a garage

We put the price in writing before any work starts. That single habit is why so many North Las Vegas homeowners call us after a verbal estimate elsewhere turned into a bigger bill. Every project carries our 365-Day Done Right Promise: if something isn’t right within a full year, we make it right, and that guarantee is stamped on paper, not spoken once and forgotten.

Our technicians are background-checked and arrive in uniform, so you know who’s on your property. We’re part of the Relay Home Co. family, established 2006, and we build with prefab and materials brands you can research on your own: Abodu and Plant Prefab for factory-built units, plus James Hardie cladding that holds up to hard desert sun. From the Aliante area to the older blocks off Carey Avenue, we plan around how your specific lot is laid out. Every project is governed by The Relay Visibility Guarantee, which means a fixed written price, real-time updates, and photo proof of the finished work. When you compare bids in North Las Vegas, that written certainty is the thing worth asking for.

ADU Services We Offer in North Las Vegas

ADU Builders

A detached casita or a garage conversion adds a full living space without touching your main house. We handle design, permitting, and construction for both site-built and prefab units. Our team of ADU specialists handles the whole build, from design through final inspection.

Learn more about our ADU Builders in North Las Vegas.

ADU Builders

Home Addition Contractor

When you need more than a casita, a full home addition expands your living space properly, with the structural and utility work done to code. We size the addition to your lot line and setback rules, which in North Las Vegas often means the difference between approval and a rejected plan.

Learn more about our Home Addition Contractor in North Las Vegas.

Home Addition Contractor

Room Addition Contractor

A single room addition, such as a primary suite, a home office, or a guest room, is a faster way to gain square footage without a full second dwelling. We match the roofline, stucco, and tile so the room looks original to the house.

Learn more about our Room Addition Contractor in North Las Vegas.

Room Addition Contractor

Neighborhoods We Serve in North Las Vegas

We build ADUs across the valley, and most of our work clusters in a handful of areas where the lot sizes and zoning line up. From the master-planned edges near Aliante to the older core near downtown, we know the local quirks. Most estimates get scheduled within a few business days.

  • Aliante and the 89084/89085 corridor
  • The 89032 core near Craig Road
  • Older downtown blocks in 89030
  • The 89081 area near the northern beltway

Why North Las Vegas’s Climate & Housing Affect ADU

North Las Vegas is one of the few valley jurisdictions where detached casitas are broadly allowed by right on single-family lots, but the lots themselves are the challenge. Nearly every buildable parcel in the 89030/89031/89032 core is hemmed in by block walls, RV parking pads, and shallow setbacks, so the real work is fitting a legal casita into a lot that was never designed for one. Out on the newer edges like 89085, HOA architectural review stacks on top of city permit review, which changes the whole sequence and timeline versus a non-HOA lot. Then there’s the heat: summers here routinely blow past 110°F, so deep roof overhangs, higher-SEER mini-splits, and shaded outdoor space aren’t extras, they’re how the unit stays livable. Cheap flat roofs and west-facing glass get punished. Most homes are post-1990s stucco-over-frame with tile roofs and slab foundations, so tie-ins are usually straightforward slab work, though older downtown lots sometimes need gas and electrical service upgraded before an ADU subpanel can go in.

Pricing for ADU in North Las Vegas

Ballpark numbers so you can plan before you call. A detached prefab ADU typically runs $180,000 to $320,000 depending on size and finishes. A garage conversion or JADU (a junior ADU built inside or attached to the existing home) usually lands between $95,000 and $160,000. A room addition runs roughly $250 to $400 per square foot, so a 400-square-foot primary suite sits near $100,000 to $160,000. These are ranges, not quotes; lot conditions, utility upgrades, and HOA requirements move the final number. You’ll get an exact written price before work starts. Call (844) 980-0541 for a free estimate.

Service Area – Cities Near North Las Vegas

Our reach extends across the northern valley. We also work in nearby Las Vegas, along with Sunrise Manor, Winchester, and Whitney, so if you’re just outside the North Las Vegas line, we can still help.

Serving North Las Vegas, NV – Our Local Coverage Area

We serve North Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About ADU in North Las Vegas

A compact kitchen inside a new ADU

Ready to get started? Free estimates in North Las Vegas
Call (844) 980-0541

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What North Las Vegas Customers Say

★★★★★ 5.0 from 3+ reviews

"Plumbing and electrical passed on the first inspection."

- Alan B.

"Clean, quiet crew. They respected the neighbors, kept noise to working hours, and swept the driveway every evening."

- Hope C.

"Photos of each milestone, which I loved. Slab, framing, roof dry-in, each one came with a few pictures by text."

- Gwen D.

How It Works in North Las Vegas

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

More ADU services in North Las Vegas

Every build below starts the same way: a free site visit and a written price.

Getting started with Benson in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Benson job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in North Las Vegas. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch