A Benson company - serving Enterprise, NV
A new modern detached ADU in a backyard
ADU Builders · Henderson, NV

ADU Builders in Henderson - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
A second-story addition that matches the existing roofline
A second-story addition with a balcony, matched to the original house
A single-story rear room addition with tall windows and a new patio
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Builders Across Henderson

If you own a home in Henderson and you’re thinking about a casita in the backyard, you’re in the right place. We build detached ADUs, attached units, garage conversions and JADUs across Henderson, and we know the local ground rules cold: the HOA architectural review that runs before city plan check, the calcium-heavy water that dictates how plumbing gets designed, and the slab-on-grade construction that makes every utility tie-in a real decision. You call us at (844) 980-0541, a live person answers, and you get a written price before any work starts. No voicemail loops. No verbal estimate that grows legs later.

Call (844) 980-0541

Henderson isn’t a copy-paste market. Green Valley, Anthem and Seven Hills each carry their own architectural committee scrutiny, and a plan that clears city code can still get bounced by a CC&R height cap. We build for both reviewers from day one.

Why Benson ADU Builders Enterprise Is Henderson’s Preferred ADU Builders Company

The bathroom inside a new ADU

We’ve built a real reputation in Henderson by doing the unglamorous part first: getting the HOA submittal and the city permit package aligned before anyone orders a truss. Homeowners who’ve worked with us describe the difference in plain terms – a written price that holds, real-time updates on where the job stands, and photos of the finished work. Our technicians have up to 20 years of experience, and every one of them is background-checked and arrives in uniform, so you always know who’s on your property.

We’re part of the Relay Home Co. family, established 2006, and every project is governed by The Relay Visibility Guarantee: a written price before work starts, a 365-Day Done Right Promise, a written guarantee on every project, and a free second visit if any covered repair fails. That’s the whole deal in one sentence, which is how we like it.

For Henderson specifically, that guarantee has teeth. When a rear setback or roofline gets drawn to city code alone and the architectural committee rejects it, the redesign is on us to solve, not on you to chase. We sequence HOA approval, site survey and utility locates first, then lock the structural package and equipment sizing to the unit’s actual sun exposure. If you want the broader picture of what we do, our ADU Builders team has the full service breakdown.

ADU Plans in Henderson

ADU Plans in Henderson start with a survey and a set of questions most homeowners haven’t been asked yet – what your CC&Rs actually cap for rear-yard height, where your perimeter wall sits, and how the water and sewer will reach the unit. Henderson’s incorporated city rules layer on top of Nevada state law, and most lots in the 89015 and 89002 ZIP codes sit on slab-on-grade tract homes built during the 1990s – 2000s boom. A plan set that ignores the HOA will cost you weeks. Plan work here typically runs $4,500 – $9,000 depending on whether you need site-specific engineering, truss re-engineering, or a full custom design.

What a Permit-Ready Set Contains

A permit-ready set means site plan, floor plan, elevations, framing and foundation details, and the utility tie-in drawings. It also needs a softener loop and scale-conscious plumbing shown at design stage, because Henderson’s Colorado River water is some of the hardest in the country. That detail belongs in the drawings, not in a change order at trim-out.

Designing to Two Sets of Rules

City code and HOA CC&Rs don’t always agree on rear setback or roofline height. Green Valley, Anthem, Seven Hills and MacDonald Ranch committees frequently cap rear-yard height below what the city would otherwise allow. We draw the roofline and window placement to the tighter of the two from the start.

ADU Contractor in Henderson

The bedroom inside a new ADU

Choosing an ADU Contractor in Henderson comes down to whether they understand the double gate: HOA architectural approval first, then Henderson plan check. On a typical Henderson tract lot, the rear property line is a raised block-and-stucco perimeter wall from the 1990s – 2000s boom, and the casita has to clear both the HOA’s rear-yard height rule and the city’s. The usual failure is a roofline drawn to city code alone. General contracting on an ADU here runs $180 – $330 per square foot depending on finish level and site conditions, and a detached one-bedroom in the 500 – 600 sq ft range typically lands $140,000 – $220,000 all-in.

Site Work and Slab Tie-Ins

These are slab-on-grade homes with tile roofs, so new water and sewer runs usually mean saw-cutting and re-pouring slab. That’s scheduled upfront, not discovered mid-build. We sequence the saw-cut and re-pour before framing so the plumbing doesn’t force a redesign.

Structural Package and Equipment Sizing

Once the HOA and permits clear, we lock the mono-truss or panelized package and size the mini-split to the unit’s sun exposure. Deep roof overhangs and a high-SEER system matter when July hits 110°F+ and an undersized unit turns into a 140°F box.

Trusted Brands We Service in Henderson

We build and source from prefab brands homeowners can research independently – Mighty Buildings, Boxabl and Plant Prefab among them, plus Tuff Shed for storage and utility structures. We don’t stock parts locally, so there’s no waiting on a warehouse; if a prefab package fits your lot and HOA, we specify it and get it to the site on schedule. Prefab panel options reduce on-site framing time, which matters when Henderson’s summer heat shortens the workable window. If a site-built approach is a better match for your CC&Rs, we’ll tell you plainly and quote both.

Common ADU Builders Problems We See in Henderson Homes

  • Permits pulled before HOA approval. Homeowners in Green Valley or Anthem sometimes start at the city and discover the approved roofline conflicts with the CC&R height cap. That forces truss re-engineering and a redesign, which costs weeks and real money.
  • No softener loop in the plan. Quoting a casita without a softener loop or scale-conscious plumbing detail is a design-stage omission in Henderson’s hard water. It surfaces later as premature fixture failure or a mid-build scope change.
  • Slab work treated as an afterthought. Treating the ADU like a standard outbuilding and skipping saw-cut and re-pour planning on 1990s – 2000s slab-on-grade tract homes means a change order appears the week the plumber shows up.
  • Monsoon and dust sealing skipped. Henderson’s monsoon-season flash flooding and dust storms punish an under-sealed envelope. Roof grading, site drainage and envelope sealing need to be specified, not improvised.

Pricing for ADU Builders in Henderson, NV

Honest ranges for Henderson, based on what we actually quote. Plan sets run $4,500 – $9,000. Detached ADU construction runs $180 – $330 per square foot all-in, so a 500 sq ft studio typically lands $95,000 – $165,000. A two-bedroom detached unit in the 700 – 900 sq ft range typically runs $175,000 – $290,000. Junior ADUs and garage conversions are the cheaper path at roughly $55,000 – $110,000 because they reuse the existing footprint and slab. Prefab panel packages can come in lower on labor but depend on lot access and HOA approval.

What moves the number: site grading and wall height, slab saw-cut and re-pour scope, utility run distance, finish level, and the structural package. Every homeowner gets a written price before any work starts. Call (844) 980-0541 – estimates are free.

We Also Serve Cities Near Henderson

We work the surrounding valley too. If you’re in Boulder City, Whitney, Paradise or Enterprise, the same double-gate process applies, though CC&R rules differ by subdivision. Learn more about our ADU Builders in Henderson coverage and keep the same written price, real-time tracking and 365-Day Done Right Promise on every job.

Serving Henderson, NV – Our Local Coverage Area

We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About ADU Builders in Henderson

Get a Written Price for Your Henderson ADU

A new sunroom addition with three walls of windows

Whether you’re planning a detached casita in Anthem, a JADU near Water Street, or a prefab unit off Lake Mead Parkway, the first step is a conversation and a written price. Call (844) 980-0541 for your free estimate. We answer live, we show up in uniform, and you’ll have a real number in writing before any shovel turns.

Written by the team at Benson ADU Builders Enterprise.

Why Henderson Chooses Benson ADU Builders Enterprise

We set the standard for ADU builders in Henderson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Henderson

Getting your ADU builders project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU builders project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU builders pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Henderson Customers Say

Trusted by homeowners across Henderson and surrounding areas.

★★★★★

"Plumbing and electrical passed on the first inspection."

Alan B.
★★★★★

"Clean, quiet crew. They respected the neighbors, kept noise to working hours, and swept the driveway every evening."

Hope C.
★★★★★

"Photos of each milestone, which I loved. Slab, framing, roof dry-in, each one came with a few pictures by text."

Gwen D.

More ADU services in Henderson

Every build below starts the same way: a free site visit and a written price.

Getting started with Benson in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Benson job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Builders in Henderson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Henderson.

(844) 980-0541

Request a Free Estimate in Henderson

Tell us about your ADU builders needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch