A Benson company - serving Enterprise, NV
A new rear addition with a vaulted beamed ceiling and tall windows
Home Addition Contractor · Las Vegas, NV

Home Addition Contractor in Las Vegas - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise
A single-story rear room addition with tall windows and a new patio
A new sunroom addition with three walls of windows
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable Home Addition Contractor Across Las Vegas

If you’re planning a room addition in Las Vegas, expect most projects to run between $180 and $450 per square foot depending on whether it’s a bump-out, a second story, or a full garage conversion. We work throughout the valley and know what Las Vegas homes actually need: heat-rated assemblies, HOA-ready drawings, and a contractor who answers the phone when the plan reviewer has a question.

Call (844) 980-0541

Call (844) 980-0541 for a free estimate. You’ll get a written price before any work starts, and you’ll know who’s showing up to your property and when.

Why Benson ADU Builders Enterprise Is Las Vegas’s Preferred Home Addition Contractor Company

A second-story addition with a balcony, matched to the original house

Las Vegas homeowners come to us because they want the plan and the price in writing before demolition day, not a verbal number that drifts once trenching starts. That’s The Relay Visibility Guarantee: a written price before any work starts, real-time updates, and a 365-Day Done Right Promise stamped on every project. If something isn’t right within a full year, we make it right.

Our technicians have up to 20 years of experience, arrive background-checked and in uniform, and we answer the phone around the clock with a live person. No voicemail loops, no waiting until Monday morning. As part of the Relay Home Co. family, every job is governed by a written guarantee and a free second visit if any covered repair fails.

Local knowledge matters more than most people expect. Which side-yard layouts pass Clark County’s coverage check, which subdivisions enforce stricter architectural review than their CC&Rs first suggest, and where caliche is likely to show up under the slab – those answers shape the budget long before a single permit is filed.

Second Story Addition Contractor in Las Vegas

A Second Story Addition Contractor in Las Vegas is usually solving one of two problems: a growing household that loves the neighborhood but has run out of lot, or a homeowner adding a primary suite or bonus room over an existing single-story footprint. In Las Vegas, going up often beats going out because the side yards here are frequently committed to RV pads and pool equipment, and a second story adds square footage without touching that buildable ground.

Second story additions in Las Vegas typically run $250 to $450 per square foot, higher than a first-floor bump-out because the existing structure has to carry the new load. Expect structural engineering, upgraded framing, a new stair, roof tie-in, and HVAC sized for the extra floor. Extreme heat means the new level’s insulation, roof reflectivity and overhangs need to be specified up front, not added later.

Working With Existing Roof and Framing

Las Vegas tract homes from the 1990s and 2000s were framed for their original height. A second story means verifying load paths, matching the stucco and tile profile, and planning how the old roof gets cut and re-tied so it sheds water correctly through monsoon season.

HOA Design Review for Upper Levels

Most master-planned communities here limit massing, sightlines and exterior finishes. We prepare elevations for architectural review alongside the county submittal so the two approvals move on the same schedule instead of stalling each other.

Garage Addition Contractors in Las Vegas

A second-story addition that matches the existing roofline

Garage Addition Contractors in Las Vegas handle a huge share of the valley’s addition work, and for good reason: converting or extending a garage adds usable square footage faster and cheaper than building from the ground up. That might mean a home office, a guest suite, a rental unit, or a third bay for a household that’s outgrown a two-car setup. Cash prices for a garage conversion in Las Vegas usually land between $120 and $250 per square foot, while a new detached or attached bay runs $200 to $400 per square foot once slab, walls and roof are accounted for.

The big question on any garage project is what the existing space was built for. A conversion needs insulation, HVAC, a raised floor or moisture barrier, and a real closet to count as living space. Extending the footprint means checking the lot-coverage and off-street parking minimums before anything else.

Conversions That Count as Living Space

A converted garage only counts toward your home’s livable square footage if it meets the county’s requirements for heating, insulation, egress and ceiling height. We design to that standard from the start, not as an afterthought.

Keeping the Garage Where You Need It

If adding a bay, the driveway, RV gate and block wall positions often dictate what’s possible. Rear-loaded and side-load garage layouts can preserve the existing paver driveway instead of tearing it up.

Trusted Brands We Service in Las Vegas

Las Vegas homeowners get real choices with us. We build and source from names you can research independently: Plant Prefab for modular construction, James Hardie cladding that stands up to intense sun and summer heat here, Tuff Shed for accessory structures, and Abodu for prefab ADUs. Curated options, fast turnaround, and one point of contact for the entire project. You’re not locked into a single take-it-or-leave-it product line.

Call (844) 980-0541 for a free estimate and a written price before work starts.

Common Home Addition Contractor Problems We See in Las Vegas Homes

  • Caliche hardpan during trenching. Northwest valley lots in 89108 and 89131 frequently have a shallow calcrete layer that turns a straightforward plumbing run into a jackhammer day. A qualified contractor tests for it before quoting a firm number.
  • HOA review skipped entirely. A county permit can clear while the subdivision’s architectural review board later halts the project or forces a footprint rework. On builder-grade tract homes, that check comes before design.
  • Undersized HVAC for 110°F+ summers. Additions built to milder-market specs can’t keep up here, and standard-SEER units drive energy bills up every July. High-SEER mini-splits, reflective or tile roofing and deep overhangs are the baseline.
  • Side yards assumed to be free. When RV pads, pool equipment and block walls already use the buildable area, a detached ADU plan won’t meet Clark County lot-coverage or off-street parking minimums. This gets checked first.

Pricing for Home Addition Contractor in Las Vegas, NV

Honest numbers help you plan. A room bump-out in Las Vegas runs $140 to $280 per square foot depending on framing and finishes. A garage conversion runs $120 to $250 per square foot. A second story addition runs $250 to $450 per square foot. Sunroom additions run $90 to $180 per square foot, and bathroom additions run $30,000 to $80,000 depending on whether plumbing has to be moved. Garage additions with a new bay run $200 to $400 per square foot.

What moves the number: caliche excavation, HOA and design review scope, whether plumbing and electrical have to be relocated, and whether the addition shares HVAC or needs its own. Every Las Vegas project gets a written price before any work starts, fixed with no change orders billed after the fact unless you approve them in writing. Call (844) 980-0541 for a free estimate.

We Also Serve Cities Near Las Vegas

Our service area covers neighborhoods like Winchester, North Las Vegas, Sunrise Manor and Paradise, plus ZIPs 89153 through 89157. Whether you’re inside the city or just outside it, you get the same written price, the same guarantees, and the same background-checked technicians. Head to our Home Addition Contractor in Las Vegas page to see the full local picture.

Serving Las Vegas, NV – Our Local Coverage Area

We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Home Addition Contractor in Las Vegas

Why Las Vegas Chooses Benson ADU Builders Enterprise

We set the standard for home addition contractor in Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Las Vegas

Getting your home addition contractor project started is simple.

1

Call or Request a Free Estimate

Tell us about your home addition contractor project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local home addition contractor pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Las Vegas Customers Say

Trusted by homeowners across Las Vegas and surrounding areas.

★★★★★

"Plumbing and electrical passed on the first inspection."

Alan B.
★★★★★

"Clean, quiet crew. They respected the neighbors, kept noise to working hours, and swept the driveway every evening."

Hope C.
★★★★★

"Photos of each milestone, which I loved. Slab, framing, roof dry-in, each one came with a few pictures by text."

Gwen D.

More ADU services in Las Vegas

Every build below starts the same way: a free site visit and a written price.

Getting started with Benson in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Benson job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Addition Contractor in Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Las Vegas.

(844) 980-0541

Request a Free Estimate in Las Vegas

Tell us about your home addition contractor needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch