A Benson company - serving Enterprise, NV
A new rear addition with a vaulted beamed ceiling and tall windows
Home Addition Contractor · Summerlin, NV

Home Addition Contractor in Summerlin - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise
A new sunroom addition with three walls of windows
A second-story addition that matches the existing roofline
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable Home Addition Contractor Across Summerlin

If you’re planning an addition on a Summerlin lot, your project runs on two clocks: the City of Las Vegas permit and the HOA design review, and the HOA track usually takes longer. We know that, and we plan around it. From The Ridges to Red Rock Country Club, we build sunrooms, second-story additions, and bump-outs that fit the community’s design guidelines, and our technicians have up to 20 years of experience. Additions are planned work, not emergency calls. Call (844) 980-0541 to schedule a free estimate and get a written price before anything is ordered or cut.

Call (844) 980-0541

Why Benson ADU Builders Enterprise Is Summerlin’s Preferred Home Addition Contractor Company

A second-story addition with a balcony, matched to the original house

Summerlin homeowners ask sharp questions before they sign, and they should. We answer them in writing: a fixed written price before work starts, a 365-Day Done Right Promise stamped on every project, and a written guarantee with a free second visit if any covered repair fails. On high-end additions here, the long-lead items (custom millwork, architectural glass, specialty finishes) drive the calendar. We sequence design-review sign-off ahead of any custom order so a palette rejection doesn’t restart the clock.

Every technician is background-checked and arrives in uniform, so you know who’s on your property. A live person answers the phone around the clock, which matters when a millwork shop or the HOA committee calls back with a question. We’re part of the Relay Home Co. family, established 2006, and every location is independently owned and operated. The work in Summerlin is performed by independent local professionals we connect you with, not a crew of ours. Our team handles room, second-story, sunroom, bathroom, garage, and bump-out additions through our Home Addition Contractor team.

Sunroom Addition in Summerlin

A Sunroom Addition in Summerlin is a glass-forward build, and glass is exactly where design review and desert heat collide. The 89135 housing stock is stucco-over-frame with tile roofs, so the sunroom has to match that palette while shading a space that faces 110°F+ summers. Architectural glass and custom screening are long-lead items here, which is why we lock the design-review submission before deposits go out. A typical sunroom addition in Summerlin runs roughly $45,000 to $95,000 depending on glass package, size, and how much custom framing the roofline needs.

Glass selection and heat gain

Low-e and solar-control glazing are close to mandatory on a Summerlin sunroom. The design effort shifts almost entirely to heat gain, sun orientation, and dust, since there’s essentially no snow load to worry about. We size the cooling for the real summer load, not a mild average.

Matching the existing palette

The stucco tone, trim, and roof tile have to read as part of the original house. HOA design review looks at visibility from the street and trail network. A sunroom tucked toward the rear is far easier to clear than one that announces itself out front.

Second Story Addition Contractor in Summerlin

A single-story rear room addition with tall windows and a new patio

A Second Story Addition Contractor in Summerlin faces a rule that doesn’t exist in unincorporated Clark County: the Summerlin design guidelines and HOA architectural committee watch the roofline and view corridors to Red Rock. A two-story massing visible from a trail or neighboring lot can stall for months. A one-story rear footprint tucked behind the main house usually clears without a fight. A second-story addition in Summerlin typically runs $180,000 to $350,000 for a full structural and finish build, with custom stair, cabinetry, and glass pushing the top end. Call (844) 980-0541 for a written estimate.

Roofline and massing review

The single most common stall is a drawn massing that breaks the roofline. We draw the alternative up front: a rear footprint that respects the view corridors and reads as secondary to the main house.

Structural and finish coordination

A second story means new structural load, new stair geometry, and a full finish package. Those selections get quoted before anything is released, so the written price holds instead of drifting into open allowances.

Trusted Brands We Service in Summerlin

When a project calls for prefab components or cladding, homeowners here want names they can research themselves. We build with Plant Prefab and Abodu for prefab work, and James Hardie for cladding where the design guidelines and existing palette allow. We don’t stock parts or materials; those are sourced per project, ordered against your approved palette, and scheduled around lead times. That’s not a delay so much as the reality of high-end work: custom components are made to order. We move approval, deposit, and order in the right sequence so nothing sits waiting on a re-order. Call us for a free estimate and we’ll walk through which brands fit your addition.

Common Home Addition Contractor Problems We See in Summerlin Homes

  • Cabinetry and glass ordered before design review signs off. A color or material rejection forces a re-order and restarts the lead-time clock. We hold custom orders until the HOA committee has approved the palette.
  • Contracts that price labor but leave finishes as open allowances. Once the designer’s selections are actually quoted, those allowances balloon. Our written price covers the finish package before work starts.
  • Two-story or trail-visible massing drawn first. It stalls in Summerlin design review where a one-story rear casita would have cleared. We draw the compliant option up front.
  • Cooling and insulation treated as an afterthought. Mojave heat at 110°F+ and intense sun exposure punish an addition sized on averages. We design the shell and cooling for the real summer load.

Pricing for Home Addition Contractor in Summerlin, NV

Real ballpark numbers for Summerlin, not a “call to find out.” A bump-out runs roughly $25,000 to $55,000. A bathroom addition lands around $35,000 to $70,000. A garage addition sits near $50,000 to $110,000, and a sunroom $45,000 to $95,000. Room additions run $60,000 to $140,000, and a second-story addition is the big one at $180,000 to $350,000. What moves the number: custom millwork and architectural glass, how much of the existing stucco-and-tile palette has to be matched, and whether design review requires a massing change. The price is fixed in writing before any custom order is released. Call (844) 980-0541 for a free estimate.

We Also Serve Cities Near Summerlin

Projects just outside the master plan are common. We also work with homeowners in Spring Valley, Las Vegas, Winchester, and Paradise, and the rules shift the moment you cross out of the unincorporated County. That’s why residents search for a Home Addition Contractor in Summerlin who understands the design-review layer specific to 89135. If your lot sits near the Summerlin edge, call and we’ll tell you which approval tracks apply.

Serving Summerlin, NV – Our Local Coverage Area

We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Home Addition Contractor in Summerlin

Why Summerlin Chooses Benson ADU Builders Enterprise

We set the standard for home addition contractor in Summerlin.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Summerlin

Getting your home addition contractor project started is simple.

1

Call or Request a Free Estimate

Tell us about your home addition contractor project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local home addition contractor pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Summerlin Customers Say

Trusted by homeowners across Summerlin and surrounding areas.

★★★★★

"Plumbing and electrical passed on the first inspection."

Alan B.
★★★★★

"Clean, quiet crew. They respected the neighbors, kept noise to working hours, and swept the driveway every evening."

Hope C.
★★★★★

"Photos of each milestone, which I loved. Slab, framing, roof dry-in, each one came with a few pictures by text."

Gwen D.

More ADU services in Summerlin

Every build below starts the same way: a free site visit and a written price.

Getting started with Benson in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Benson job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Addition Contractor in Summerlin?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Summerlin.

(844) 980-0541

Request a Free Estimate in Summerlin

Tell us about your home addition contractor needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch