A Benson company - serving Enterprise, NV
A new rear addition with a vaulted beamed ceiling and tall windows
Room Addition Contractor · Las Vegas, NV

Room Addition Contractor in Las Vegas - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise
A second-story addition with a balcony, matched to the original house
A single-story rear room addition with tall windows and a new patio
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable Room Addition Contractor Across Las Vegas

Adding a room in Las Vegas is a different job than adding one almost anywhere else. The lots are already built out, the ground hides caliche, and the HOA has an opinion about your roofline before you’ve bought a single 2×4. We work with independent local professionals who know that terrain, from the master-planned subdivisions off the 215 to the older tract streets near Nellis. You get a written price before any work starts and a 365-Day Done Right Promise on the finished job. Call (844) 980-0541 to schedule your free estimate and talk through what your lot can actually hold.

Call (844) 980-0541

Why Benson ADU Builders Enterprise Is Las Vegas’s Preferred Room Addition Contractor Company

A second-story addition that matches the existing roofline

People in Las Vegas come to us because they want the plan and the number on paper before demolition day, not a verbal estimate that drifts once the walls open up. Our technicians have up to 20 years of experience, and the local professionals who do the work here know Clark County’s lot-coverage and setback rules well enough to flag problems while the plans are still on screen.

We’re part of the Relay Home Co. family, and every project runs under The Relay Visibility Guarantee: a written price up front, live tracking, and a written guarantee stamped on the job. If a covered repair fails within 365 days, we come back and make it right, with a free second visit if needed. Live phone support is available around the clock, and every technician on site is background-checked and arrives in uniform.

That transparency is what homeowners around the valley tell us they were missing from other bids. You can see our work and services on our Room Addition Contractor page, and we serve the wider metro through our Las Vegas hub.

Home Addition Plans in Las Vegas

Home Addition Plans in Las Vegas usually start with a builder-grade tract home where the owner wants a bigger master suite or a dedicated office, and the paperwork matters as much as the framing. A typical plan set here has to satisfy both the subdivision’s architectural committee and the county’s lot-coverage limits, which is why we pull both sets of approvals early instead of after the slab is poured. A simple bump-out plan in Las Vegas runs roughly $1,800 to $4,500; a full addition plan with structural and MEP drawings typically lands between $4,000 and $9,000. Call (844) 980-0541 for a free estimate.

What Goes Into a Plan Set

You’ll see site and plot plans, framing and foundation details, and mechanical, electrical, and plumbing drawings sized for the addition. We also include the roof tie-in and shading details, since harsh sun here punishes a poorly planned overhang.

Timing the Design Before You Build

Plans usually take a few weeks to draft and revise, and HOA review can add its own window on top. Getting the design locked early keeps everyone from rushing the permit stage.

In Law Suite Builders in Las Vegas

A new sunroom addition with three walls of windows

In Law Suite Builders in Las Vegas are usually asked for two things: privacy for the family member moving in and a layout that doesn’t need its own utility trench across a paver driveway. Most of these suite projects here are detached slab-on-grade units or garage conversions, because the stucco-over-wood-frame houses off the 89108 and 89149 corridors are sound and just need a new conditioned space attached or carved out. A finished in-law suite in Las Vegas generally runs $95,000 to $180,000 for a basic layout, and $150,000 to $260,000 when you add a kitchenette, full bath, and separate entry. Call (844) 980-0541 for an exact quote on your lot.

Detached Versus Attached Suites

A detached unit gives the most privacy but needs its own footing, utilities, and roof. An attached or garage conversion often costs less and shades better against summer heat.

Designing for a Second Household

You’ll want a separate entrance, its own mini-split, and a short path to the main house. Aging-in-place details like wider doorways are worth deciding now, not later.

Trusted Brands We Service in Las Vegas

We can build your addition with materials and prefab systems from names you can research yourself, including James Hardie cladding for the exterior and Plant Prefab for panelized components when a faster shell makes sense. We don’t keep parts or materials in stock, so nothing is pulled from a local warehouse; the specified products are ordered for your job and delivered to the site. Boxabl is another option some owners ask about for compact structures. The upside of working with established brands is predictable lead times and specs you can verify before you commit. Call (844) 980-0541 and we’ll walk you through which fits your plan.

Common Room Addition Contractor Problems We See in Las Vegas Homes

  • Skipping HOA architectural review. In master-planned communities around the valley, building before the committee signs off can trigger a stop-work order and a forced redesign after framing has already started. Get the approval first.
  • Underestimating caliche depth. The block walls that define rear yards here also hide shallow calcrete layers that stall footing excavation. A crew that didn’t test soil early ends up on a jackhammer with a schedule sliding behind.
  • Upgrading the wrong finishes. Replacing builder-grade interior doors while ignoring attic insulation or reflective roofing wastes money and misses the heat-mitigation work that matters most in 110°F summers.
  • Overloading the existing HVAC. A new room tied into an older system that was sized for the original square footage will run hot all summer. A properly sized high-SEER mini-split avoids that.

Pricing for Room Addition Contractor in Las Vegas, NV

An honest number for a room addition in Las Vegas starts around $38,000 to $60,000 for a simple bump-out, and runs $70,000 to $160,000 for a full attached addition with plumbing and a bath. In-law suites land between $95,000 and $260,000 depending on size and finishes. What moves those figures is the caliche you hit during excavation, whether the HOA requires a design change, and how far utilities have to trench across existing paver pads and pool equipment. We give you a written line-item price before any work starts, so nothing gets billed after the fact. Call (844) 980-0541 for a free estimate.

We Also Serve Cities Near Las Vegas

If you’re just outside the city line, we work across Winchester, North Las Vegas, Sunrise Manor, and Paradise too. The same lot-coverage rules, HOA review, and soil conditions apply across most of these neighborhoods, so the process barely changes. Call (844) 980-0541 in Las Vegas and we’ll confirm coverage for your ZIP, including 89128, 89130, 89108, and 89149.

Serving Las Vegas, NV – Our Local Coverage Area

We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Room Addition Contractor in Las Vegas

Why Las Vegas Chooses Benson ADU Builders Enterprise

We set the standard for room addition contractor in Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Las Vegas

Getting your room addition contractor project started is simple.

1

Call or Request a Free Estimate

Tell us about your room addition contractor project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local room addition contractor pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Las Vegas Customers Say

Trusted by homeowners across Las Vegas and surrounding areas.

★★★★★

"Plumbing and electrical passed on the first inspection."

Alan B.
★★★★★

"Clean, quiet crew. They respected the neighbors, kept noise to working hours, and swept the driveway every evening."

Hope C.
★★★★★

"Photos of each milestone, which I loved. Slab, framing, roof dry-in, each one came with a few pictures by text."

Gwen D.

More ADU services in Las Vegas

Every build below starts the same way: a free site visit and a written price.

Getting started with Benson in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Benson job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Room Addition Contractor in Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Las Vegas.

(844) 980-0541

Request a Free Estimate in Las Vegas

Tell us about your room addition contractor needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch